2nd Street Bridge

PROJECTS

2nd Street Bridge

Owner:  KY Department of Transportation
Construction Manager: Mac Construction
Completion: October 2010

On October 13th, 2010, 2nd Street was reopened by Mayor Abramson and the decorative lighting under the bridge was turned on. Louisville Downtown Development Corporation managed the design and construction of the formerly dark, uninviting area. Now it serves as a gateway and gathering point for arena functions, events and daily activities.

Key Features

  • Installation of same strobe light used on Eifel Tower
  • Lighting Controls to sync with nearby KFC YUM! Center
  • Over 5000’ of Rigid Steel Pipe Installed
  • New utility Transformer, power feeder up 2nd street over 600’ away
  • Convert base of 2nd Street into a Utility/ Equipment Room
  • Installation of Fixtures from a suspended scaffolding with working heights over 90’