Owner: Beam Global
Construction Manager: Beam Global
Completion: December 2011
Peak Manpower: 30 Men
Contract: $2.0 Million
Scope: AES worked directly with Jim Beam on a new process facility to help keep up with the strong demand for bourbon across the world. AES scope of work consisted of building power and lighting, medium voltage cable and instrumentation. 80% of the work too place in Class 1 Div 1 requiring explosion proof conduit installation. Over 20,000’ control wire and 800 terminations.