Owner: Barton 1792 Distillery
Construction Manager: Barton 1792
Completion: December 2017
Peak Manpower: 18 Men
Contract: $675,000.00
Scope: AES worked directly with Barton on a new dry house. Installation of a new MCC, Branch Power and Lighting. Secondary feeders from MCC to pumps and equipment throughout 4 story building. Valve instrumentation along with over 15,000’ control wire and 600 terminations.